Online application for booking

Find A Home

  • to:
  • to:

Featured ListingPreviousStopNext

Apartment AWR - KEW GARDEN [Land Project] 0 APARTMENT UNITS

Address:
Tongabari, Ashulia, Dhaka. [ more ]

Apartment AWR - AYDAN 7 APARTMENT UNITS

Address:
Plot No # 98, Block No # D, Basundhara Residential Area... [ more ]

Apartment AWR - CARLTON 1 APARTMENT UNITS

Address:
Plot No # 245, Block # C, Basundhara, Dhaka. [ more ]

Prject Details

  • Type: Residential Only
  • Facing: North
  • Per Floor: 2 Units.
  • Start Date: Oct-01, 2009
  • Scheduled Completion Date: Oct-31, 2012
  • Project Accomplished: 10 %
  • Location Mirpur
  • Address:
    307 Ahmed Nagor, Mirpur, Dhaka-1216.
  • Country: Bangladesh
  • Number of Residential Units : 12
  • Total Parking area: 6
  • Number of Car Parking Spaces : 3
  • Dag # : 49223
  • Rajuk Approval Status: Approved
Make enquiry now! Sign up for email alerts for this project

My Home Suraiya is 7 storied residential apartment building. It's located with two roads of North-South and East-West direction. It is an ideal residential house for the mid - income group as it is in a walking distance from Mirpur Circle-1, Bashir Uddin high school, mosque, bazaar, and other community facilities leaving sufficient empty space as Rajuk's new land use rule followed that facilites free movement of fresh air and entrance of day light all the times. A good transport and communication system exists to reach any part of Dhaka city from this area.

  • 1. Secured Decorative entrance gate with name, address and company Logo on polished marble or granite.
  • 2. Comfortable internal driveway leads to the specious car parking.
  • 3. Reception area & Lobby with an elegant guest waiting area & separate toilet for visitors.
  • 4. Lift:6 (Six) Persons capacity (OTIS / Sigma / Imported.
  • 5. Lift Lobbies & Staircase: Tiles finished lift lobby.
  • 6. Apartment Layouts: ensuring maximum advantages, especially in relation to the daylight and outside view.
  • 7. Cable TV Provision: Parallel connection point in Master bedrooms & living / family living room in each apartment.
  • 8. Generator: One Standby Diesel driven Water cooled emergency generator.
  • 9.Water Pumps
  • 10. Roof Top with well designed parapet Wall, Cloth dying area with toilet.
  • 11. Intercom & Internet connection facilities.
  • 12. Concealed TV & Dish connection cable.
  • 13. Reserved Car Parking with stopper in Covered & Protected with Grills, Ground Floor for Residents with Comfortable Driveways.
  • 14. Appropriate Electricity Supply.
  • 15. Underground Water Reservoir with to hold three days water supply with one Main Lifting Pump and one Standby Pump.
  • 16. Sewerage line System will be in underground and connected with main line.
  • 17. Gas Pipeline Connection from TITAS Distribution System as per Total Calculated Consumption.
  • 18. Protected electric room for Generator & substation.
  • 19. Fire Extinguisher on each floor & lobby area
  • 20. Drivers waiting in ground floor
  • 21. And may more (Details are available on request).

1. Total Foundation and Superstructure Design and Supervision by a team of reputed and professional Structural Design Engineers. 2. Structural Design Parameters based on American Concrete Institute (ACI), American Standards of Testing Materials (ASTM) Codes and Bangladesh National Building Code (BNBC). 3. Structural Analysis for Design utilizes the latest Methodology. 4. Heavy Reinforced Cement Concrete Foundation 5. Systematic Structural Combination of Steel Reinforced Concrete Frame and Shear wall Core. 6. Floor Slabs all Reinforced Cement Concrete. 7. Comprehensive Checking and Testing of all steel reinforcement by professional Design and Supervising Engineers. 8. All Structural Materials including Steel, Cement, Bricks, Sylhet Sand and other Aggregates etc. of highest available standard and screened for quality. 9. Direct Supervision at every stage of construction by a team of experienced and qualified Civil Engineers to ensure Highest Quality of Workmanship. 10. Construction Site Equipment employed includes Virgo-hammers, Mechanical Rollers, Steel Cutting & Bending Equipment, Welding Equipment, Concrete Mixers, Concrete Vibrators, Water Pumps, Material Handling Equipment, Leveling Instruments, and Theologize etc. 11. Systematic Testing of concrete and other completed work samples at every stage from Quality Control Laboratories (BUET). The test result will be made available to the Landowner. 12. Structure designed to withstanding Earthquakes of prevalent intensity.